This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data: Water Table level : m
Read Full Method Statement
The purpose of this standard construction equipment safety procedure is to provide safe operating instructions for dozer operators working on any kind of construction or road projects. Project director is overall responsible for the implementation of this standard procedure. Authority to Operate
Read Full Method Statement
The purpose of this safework method statement is to define the rules and conditions designed to ensure that concrete and paving demolition work is planned so as to enable personnel to be aware of all the procedures and dangers involved and to
Read Full Method Statement
Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual
Read Full Method Statement
This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out
Read Full Method Statement