The procedure below covers the Hazard Identification and Risk Assessment that involves on the project sites related with the operation and maintenance of heavy earth moving plant and machineries. Earthmoving usually involves the operation of large, heavy and cumbersome vehicles in an
Read Full Method Statement
This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe
Read Full Method Statement
This construction method statement details general PT slab procedure to follow for Post Tension Works for slabs at any kind of civil construction project. PT slab method of statement covers the works of the post tension from placing of the ducts to
Read Full Method Statement
The purpose of this method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for water tank in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality
Read Full Method Statement
This standard specification covers below: Excavating and grading to the required grades and limits as shown on the Drawings and as described in this Specification; Supply and placement of geotextile; Supply and placement of granular backfill to the required grades and limits
Read Full Method Statement