Category: Civil Method Statements
-
Safe Work Method Statement for Installation of Rubber Flooring
Below is given the method statement for installation of rubber flooring related to any type of project. Arrange the following instrument’s or equipment. Cutting knife Wood saw Vertical cutting saw with mixed cutting blades Carpenter’s line Notched spatula 900 angle Measuring tape 2 m screed bar 1 m long angle for cutting using the Knife…
-
Safe Work Method Of Statement for Acoustic Fabric Panels Installation
1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance prior to start work. 2.0 Proper Scaffolding should be provided for tall walls. It should be inspected and approved by safety officer. 3.0 RFIA should be submitted and ensure its approval prior to start work. 4.0 Before Installation ensure wall is free from any…
-
Safe Work Method Statement for Vinyl Flooring
Below is given the safe Method Statement for performing the installation of vinyl Flooring in simple steps. Selected working area should be barricaded to avoid accidents & damages and obtain necessary clearances and approvals from Engineers including MEP clearance. Inspection request to be raised and ensure its approval prior to start vinyl flooring. Ensure the…
-
Method Statement for Masonry Water Base & Emulsion Painting Works
1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance 2.0 Proper Scaffolding should be provided for tall walls. It should be inspected and approved by safety officer 3.0 RFIA should be submitted and ensure its approval prior to start paint works 4.0 Concrete substrate must be dry, free from any dust, grease and…
-
Method Statement for Wood Paint for MDF Skirting
1.0 Obtain necessary clearances and approvals from civil engineers. 2.0 Inspection for clearance should be submitted and its approval to be ensured prior to start paint works. 3.0 Surface must be clean, dry, and from any dust. 4.0 Apply first coat using brush, roller or spray to achieve a uniform thickness as per manufacturers’ recommendations 5.0…
-
Termite Treatment Safe Work Method Statement for Anti Termite
Safe Work Method Statement for Anti Termite Treatment is given below in a short form that contains only the steps involved in the activity. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents & damages Ensure suitable access / safe ramps provided for safety of all…
-
Installation Method Statement For GRP Sectional Water Tanks
Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required…
-
Method Statement For Starting Wild Air Cooling Of Building
What is wild air in HVAC? Wild air is the supply of air to a building which is being constructed or renovated and having central air conditioning system. In order to fulfill the temporary cooling and ventilation requirements for a building its air handling units are put in operation to feed the air which is…
-
Method Statement For Installation of Glazing Panel to GRP Fins
Programs of work for the Installation of Glazing Panels to GRP Fin shall follow the Planning and Programming of the Main Contractor. In event of any major changes in execution or shift in milestones of work schedule could occur, revised method statement and work program shall be submitted for approval. Materials Submittal: Materials Submittal usually contains…