Method Statement For Installation of GI Conduits For Electrical Works

Following tools shall be required for performing the installation of GI Conduits for electrical works. Portable hand tools. Portable Drilling Machine/ Grinding Machine Spirit Level Level Threads G.I. Conduit bending and threading equipment INSTALLATION PROCEDURE FOR INSTALLATION OF GI CONDUITS Ensure that the work area is ready and safe to …

Read More »

Safe Work Method Of Statement For Installation of Fire Alarm FA System

1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Fire Alarm FA System through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function …

Read More »

Method Of Statement For Installation of Earthing, Bonding & Lightning Protection System

1.0 PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Earthing, bonding & Lightning protection system through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to …

Read More »

Method Statement For Installation of Diesel Generator Set

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Diesel Generator Set through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. TOOLS …

Read More »

Method Statement For Installation Of CCTV Camera System

Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading, shifting & storage as follows; All packages for …

Read More »

Method Statement For Installation of Building Management System BMS Including Field Devices

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Building Management System BMS to ensure that the site installation work execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools: Standard’s electrician & …

Read More »

Method Statement For Installation of HV Switch Gear 11 KV Panels

Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved material submittal and approved drawings by authorities and as per rules and standards. Required Tools: Fork Lift or Hydraulic Crane, Chain Pulley Block & necessary arrangement in line …

Read More »

Method of Statement for Installation and Termination of LV Cables & Wires

Safe Work Method of Statement for Installation and Termination of LV Cables & Wires for low voltage power distribution system. Required Tools: Portable hand tools Portable Drilling Machine/ Grinding Machine Spirit Level Level Threads Hydraulic Crimping tool 500 / 1000 volt Insulation Tester Digital multimeter Cable Rollers Cable Drum Jack …

Read More »

Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders

Below is a complete Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders in compliance with project specifications and approved material submittals. Tool Required: Portable hand tools Portable Drilling Machine/ Grinding Machine Jigsaw Machine Spirit Level Level Threads Material Handling & Storage On receipt of the cable tray, trunking, …

Read More »

Method Statement For Installation Of Central Battery System CBS & Panels

Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material  On receipt of the Central Battery System and accessories at site, …

Read More »