Category: Electrical Method Statements
-
Method Statement For Installation Of CCTV Camera System
Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading, shifting & storage as follows; All packages for the complete CCTV reaching to…
-
Method Statement For Installation of Building Management System BMS Including Field Devices
The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Building Management System BMS to ensure that the site installation work execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools: Standard’s electrician & wireman’s tools. Portable hand tools.…
-
Method Statement For Installation of HV Switch Gear 11 KV Panels
Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved material submittal and approved drawings by authorities and as per rules and standards. Required Tools: Fork Lift or Hydraulic Crane, Chain Pulley Block & necessary arrangement in line with the Manufacturer’s, recommendations and…
-
Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders
Below is a complete Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders in compliance with project specifications and approved material submittals. Tool Required: Portable hand tools Portable Drilling Machine/ Grinding Machine Jigsaw Machine Spirit Level Level Threads Material Handling & Storage On receipt of the cable tray, trunking, cable ladder and accessories at…
-
Method Statement For Installation Of Central Battery System CBS & Panels
Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material On receipt of the Central Battery System and accessories at site, necessary precautions shall be taken for…
-
Testing & Commissioning Of UPS System – Method Statement
The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to the loads under normal and abnormal conditions, including loss of the utility AC power.…
-
Method Statement For Fluke Testing & Commissioning Of Telephone Data System
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution complies with the project requirements and serves the intended function to satisfactory level of…
-
Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s
The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. TOOLS /…
-
Testing & Commissioning Of Submain Distribution Boards SMDB’s
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools for SMDB…
-
Testing & Commissioning of Motor Control Center – Method Statement
The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Motor Control Center through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level.…