Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading,
Read Full Method Statement
The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Building Management System BMS to ensure that the site installation work execution complies with the project requirements and serves the intended
Read Full Method Statement
Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved material submittal and approved drawings by authorities and as per rules and standards. Required Tools: Fork Lift or Hydraulic Crane,
Read Full Method Statement
Below is a complete Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders in compliance with project specifications and approved material submittals. Tool Required: Portable hand tools Portable Drilling Machine/ Grinding Machine Jigsaw Machine Spirit Level Level Threads Material Handling &
Read Full Method Statement
Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material On receipt of
Read Full Method Statement