Safe Work Method Of Statement For Installation Of Fan Coil Units FCU’s

Required tools for installation works: Following tools & equipment shall be arranged before installing the FCU’s. Fork Lift or Crane with capacity & arrangement in line with the Manufacturer’s , recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools. Portable Drilling Machine/ Grinding Machine & Angle Cutter. Spirit Level / Level…

Read More

Method Statement For Installation of Ducted & Split Type DX Split Units

The purpose of this  safe work method statement is to define the procedure step by step to implement the correct practices for Installation of Ducted & split type DX split units. Following equipment’s and tools shall be arranged before starting the installation works. Fork Lift or Crane with capacity & arrangement in line with the…

Read More

Method Statement for Testing & Commissioning of Calorifiers

The purpose of this method statement is to define the procedure for the on site commissioning of the Calorifiers. This method statement should be read in conjunction with the relevant method statement for installation outlining the responsibility and quality verification to be performed by various parties. Method Statement for Commissioning of Calorifiers The manufacturer’s commissioning Engineer…

Read More

Method Statement For The Installation of Fan Coil Split Units Ducted & DX Type

1- PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of FCU (Ducted &DX) through the guide line contained here in so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. 2- SCOPE…

Read More