Basement MEP Coordination Shop Drawing Preparation and Checklist

Fire-Fighting-Sprinkler-System-method-statement-for-Testing and Commissioning

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for

2023
Jul
10

Radiation Safety Procedure for Site Gama Ray Radiography for NDT Weld Test

Radiation Safety Procedure for Site Gama Ray Radiography

This method of statement describes the specific performance requirement for safe conduct of industrial gamma ray radiography at a project site. The method shall be implemented as per the local regulations concerning Radiation Protection in using sealed Radioactive isotopes in Industrial Radiography.

2023
May
21

Safe Work Method of Statement SWMS & Risk Assessments [Download]

If you are looking for combination of safework method statement for construction works with risk assessments then you are at right place. This website provides tons of safe work method statements that are editable and reusable by the people like you who

2022
Jan
18

Block Wall Construction Control Procedure for Blockwork

Block Wall Construction Control Procedure for Blockwork

This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out

2021
Dec
13

Construction Vehicle and Plant Servicing Procedure

Construction Vehicle and Plant Servicing Procedure

Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work: