Tag: installation method of booster pumping system
-
METHOD STATEMENT FOR INSTALLATION OF WATER SUPPLY PUMP (HOT & COLD)
METHOD STATEMENT FOR INSTALLATION OF WATER SUPPLY PUMP (HOT & COLD) Ensured that the proper clearance is available from civil side before commencement of works. Ensured that the work area is clean and safe for carrying out the activities. Prior to start of works, it shall be ensured that the relevant shop drawings and coordination drawings…