Method Statement for Installation of Grills, Diffusers, Registers & Louvers

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Grills, Diffusers, Registers & Louvers through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and materials…

Read More

Method Statement For Installation of Ducted & Split Type DX Split Units

The purpose of this  safe work method statement is to define the procedure step by step to implement the correct practices for Installation of Ducted & split type DX split units. Following equipment’s and tools shall be arranged before starting the installation works. Fork Lift or Crane with capacity & arrangement in line with the…

Read More

Method Statement for Testing & Commissioning of Calorifiers

The purpose of this method statement is to define the procedure for the on site commissioning of the Calorifiers. This method statement should be read in conjunction with the relevant method statement for installation outlining the responsibility and quality verification to be performed by various parties. Method Statement for Commissioning of Calorifiers The manufacturer’s commissioning Engineer…

Read More

METHOD STATEMENT FOR INSTALLATION OF GRP PIPES FOR STORM WATER

METHOD STATEMENT FOR INSTALLATION OF GRP PIPES FOR STORM WATER TOOLS / EQUIPMENT Portable Hand tools Portable Drilling machines Measuring rule An open ended cylinder 250 mm long and approx.150 mm internal dia. A piece of standard 150 mm dia pipe is suitable. A metal rammer 0f 36 to 40 mm dia. and weighing approx.one Kg. Material…

Read More