1. PURPOSE The purpose of generating this mechanical method statement is to define the procedure step by step to implement the correct practices for Installation, Pressure Testing, Insulation and cladding of Chilled Water Piping network including valves and accessories. Following the the
Read Full Method Statement
1. PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for GI Cladding of Ductwork & Pipework through the guide line herein so as to ensure that the job execution complies with
Read Full Method Statement
Below is a detailed Method Statement For Field Joint Insulation of Pre Insulated Chilled Water Pipe. Following tools and equipment shall be arranged before starting the pipe joint insulation process. Rayjoint, S113 sealing strips Propane gas bottle,regulator and gauge,hose and torch Abrasive tape
Read Full Method Statement
1. PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation, Termination of LV Cables & Wires guidelines contained herein so as to ensure that the job execution complies with the
Read Full Method Statement
1. PURPOSE The purpose of this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Telephone System through the guide line contained herein so as to ensure that the job execution complies with the requirements
Read Full Method Statement