2015
Aug
6

Safe Work Method Of Statement For Installation of PVC Conduits in Concrete Slabs

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of PVC conduits through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the

2015
Aug
5

Safe Work Method Of Statement For Installation of Fire Alarm FA System

1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Fire Alarm FA System through the guide line contained herein so as to ensure that the job execution

2015
Jun
6

Testing & Commissioning Of Water Booster Pump Set – Method Statement

The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of domestic Water Booster Pumps through the guidelines contained herein so as to ensure that the

2015
May
30

Testing & Commissioning of Motor Control Center – Method Statement

The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Motor Control Center through the guidelines contained herein so as to ensure that the job

2015
Apr
26

Safe Work Method Of Statement For Testing and Commissioning of Diesel Generators

Purpose The purpose of this method statement is to define the testing and commissioning procedure of the Diesel Generators within the project. This includes pre-commissioning checks, commissioning tests and system interface tests. Scope The scope of this method statement is to define