Method Statement for Installation & Leak Test of Underground Drainage Piping System
This document applies to the inward site inspection, installation and inspection methods to be adopted for the underground drainage piping system. The work methods are summarized as follows: Mandatory Equipment Required Measuring tape and setting out markers Electric drill hammer Hack saw cutter Pipe Fitters tool box Certified mobile scaffolds/step ladder uPVC pipes, fittings &…
-
Honeycomb Concrete Repair Method Statement
In order to do the honeycomb concrete repair work for structural element all necessary machines and tools shall be arranged like mixer machine, wheelbarrows, wire brush, angle grinder, measuring tapes, and other handy tools. Below is the repairing material for reference purpose, it can be any suitable equivalent local materials as per the locality of…
-
Safe Work Method Statement SWMS Explained – Quality Awareness
—
Safe Work Method Statements – SWMS What is a SWMS? SWMS is document detailing how a particular task or activity will be carried out, including required resources, responsibilities, quality and HSE requirements etc. What is the purpose of SWMS? To outline a correct, systematic and safe method of work for the particular task or activity…