Category: Civil Method Statements
-
Safety Requirements for Installation of Upper Floor Wall Frames
The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the extent necessary, to…
-
Concrete Pavement Method Statement
This page covers the method statement for the construction of plain cement concrete pavement in accordance with the drawings & specifications and in conformity with lines, grades and cross sections shown on the drawings. All the joint details shall be as per the approved working drawing. Concrete pavement installations shall be done in compliance with…
-
Basement MEP Coordination Shop Drawing Preparation and Checklist
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the…
-
Safe Work Method of Statement SWMS & Risk Assessments [Download]
If you are looking for combination of safework method statement for construction works with risk assessments then you are at right place. This website provides tons of safe work method statements that are editable and reusable by the people like you who are willing to prepare technical documents and installation procedure in the safe work…
-
Method Statement for Piling Work using the Diesel Hammer
Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor. The surveyor will also be responsible for accurate survey location during erection and…
-
Sheet Pile Installation Method Statement
The installation of sheet piles are the famous type of temporary works for the construction of building or bridge during foundation works such as pilecap structural. Steel sheet piles are long structural sections with a vertical interlocking system that creates a continuous wall. The walls are most often used to retain either soil or water.…
-
Method Statement for Earth Work Including the Preparation of Formation Level
The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications. Method statement covers the requirements for all earth works up to and including…
-
Formwork Shuttering Installation Method of Statement
The purpose of this civil work method statement is to lay down the systematic procedures for the various activities required for reliable formwork to ensure that all works are carried out according to the designed drawings and Technical/Contract specifications. Scope of this method statement shall apply to all the Formworks/Shuttering at a construction project. The…
-
Safe Work Method Of Statement For Dewatering Work
This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data: Water Table level : m Depth of excavation : -2.30m (Gen) Depth of excavation : -3.30m / 5.50m…