2024
Jan
5

Pipe Welding Procedure

Pipe Welding Procedure

The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in

2023
Dec
30

Installation of HVAC VCD Fire Smoke Dampers and Accessories

This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of

2023
Nov
20

FCU Installation Method Statement ( Split Units Ducted & DX Type)

Ducted-Split-Units-DX-Installation-method-of-statement

Below document covers FCU installation method statement that covers steps to install FCU units of ducted and DX type air conditioners. By following this HVAC method statement contractor shall ensure that the job execution complies with the project specification and manufacturer requirements

2023
Sep
1

Basement MEP Coordination Shop Drawing Preparation and Checklist

Fire-Fighting-Sprinkler-System-method-statement-for-Testing and Commissioning

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for