Method Statement for Fire Suppression System Installation Testing & Commissioning

Required Tools/Equipment

Preparation Work Before Installation

Fire Suppression System Installation Procedure
Piping Work

Installation of Fire Detection System

Testing & Commissioning Of SINORIX1230 Fire Suppression System

I. Check the panel functions for its proper working

  1. Power supply monitoring
  2. Detector line Monitoring
  3. Alarm line monitoring
  4. Silence alarm switch operational
  5. Reset system switch operational
  6. Evacuate switch operational
  7. Auto manual select switch operational

II. Check for the field devices

  1. Ionization Smoke detectors operational
  2. Optical smoke detectors operational
  3. Cylindrical Pressure monitoring
  4. Air conditioning unit shut down
  5. Damper / Curtain shutdown
  6. Abort switch operational
  7. SINORIX 1230 actuator solenoid operational
  8. Manual release unit operational

III. Check the cylinder accuracy

  1. Weight of SINORIX 1230 agent
  2. Pressure of the cylinder
  3. Leakage test