Method Statement For Installation Of Transformers

Following tools shall be arranged before starting the process of installation of transformer.

GENERAL INSTALLATION REQUIREMENTS

Ensure all civil works are completed for the area including floor paint to carryout the installation, and clearance is obtained from respective authorities to proceed further.

Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are available at site as per approved material submittals.

Ensure the materials are stored properly and there is no mark of damage or deformity of any kind before issuing the material from site store.

Transformer will be off loaded to the place nearest to the installation and protected properly from dust & environment, etc.

Transformer Installation Method

Prior to installation, the foundation will be checked for cleanliness and level.

INSTALLATION PROCEDURE FOR TRANSFORMERS