Below is step wise procedure or method statement for the installation of calorifier.

Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are available at site as per approved material submittals.

Ensure the materials are stored properly and there is no mark of damage or deformity of any kind before issuing the material from site store.Approved Calorifier accessories shall be used for installation purpose.

Calorifier shall be installed on the Foundation ensuring adequate space is available for valves, piping and for future maintenance. Calorifier accessories shall be installed as shown on the approved shop drawing.