2024
Feb
4

Confined Space Working Method Statement – Occupational health and safety Procedure

Confined Space Working Method Statement - Occupational health and safety Procedure

This method statement covers working inside confined space for MEP and civil works for any kind of project. Project health and safety team is responsible for implementation of below method in order to ensure that all workers are safe while working inside

2024
Feb
1

Safety Requirements for Installation of Upper Floor Wall Frames

Safe Work Method Statement for Installation of Upper Floor Wall Frames

The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures

2024
Jan
5

Pipe Welding Procedure

Pipe Welding Procedure

The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in

2023
Dec
30

Installation of HVAC VCD Fire Smoke Dampers and Accessories

This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of