Safe Work Method Statement For Testing & Commissioning of DX Split Units

Below is given major sections of a safe work method of statement for Testing & Commissioning of DX Split Units. This is a normal procedure for doing testing activity. All method statement can be called safe work method statements once we attach a comprehensive risk assessment that covers all tools and equipment procedure of handling.

If you are using this method statement for safe working method of statement purpose we suggest to download complete package from our safe work method statement download page and you can submit the same for client approvals.

Equipment / Tools Required:

Following tools shall be arranged before starting the job.

PROCEDURE FOR TESTING & COMMISSIONING

General Requirements

 Material Transport/ Delivery

Storage on Site Store

Sequence of Testing & Commissioning for the DX Split Units

Safety Requirements

Preliminary Checks / Pre Commissioning

Before commencement of Testing & Commissioning activity, the supervisor/ engineer must ensure that:

General Testing & Commissioning Procedure for DX Split Units

ATTACHMENTS
  1. Inspection & Test PlanTesting & Commissioning  Check Sheet
  2. Commissioning Completion Certificate Form
  3. Handing Over Certificate Erection Form
  4. Punch List Form
  5. Risk Assessment
  6. DX Split Units Technical Details