2024
Mar
10

Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and Belts

Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and Belts

Below is a standard procedure that provides direction and assists in the selection, use and inspection of the various types of fall protection/prevention devices that could be used on any construction project site where personnel and assets are at risk from fall

2024
Feb
4

Confined Space Working Method Statement – Occupational health and safety Procedure

Confined Space Working Method Statement - Occupational health and safety Procedure

This method statement covers working inside confined space for MEP and civil works for any kind of project. Project health and safety team is responsible for implementation of below method in order to ensure that all workers are safe while working inside

2023
Dec
30

Installation of HVAC VCD Fire Smoke Dampers and Accessories

This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of

2023
Nov
28

SWMS Safe Work Method Statement for Electrical Conduit Installation Prior to Pouring Concrete

Personal Protective Equipment (tick as appropriate)

Instructions for the implementation of this SWMS: Review the SWMS on site with the relevant employees and contractors. Identify and document the high risk Construction Work to be performed. Identify and document the site PPE requirements for the task. Document any additional