Category Archives: Occupational Health and Safety

Radiation Safety Procedure for Site Gama Ray Radiography for NDT Weld Test

This method of statement describes the specific performance requirement for safe conduct of industrial gamma ray radiography at a project site. The method shall be implemented as per the local regulations concerning Radiation Protection in using sealed Radioactive isotopes in Industrial Radiography. This page gives just general information for basic understanding and should not be… Read More: Radiation Safety Procedure for Site Gama Ray Radiography for NDT… »

Risk Assessment for Drainage Pipes Installation

Construction and HSE team must ensure that hazard identification is complete before start of the drainage piping work. The construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal requirements, potentially high risks). Construction and HSE team to prepare the risk assessment… Read More: Risk Assessment for Drainage Pipes Installation »

Construction Vehicle and Plant Servicing Procedure

Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work: Ensure that all maintenance and servicing activity is done only in designated area.… Read More: Construction Vehicle and Plant Servicing Procedure »

First Aid Procedure – Construction Project First Aid Kit Box Contents

Below is a basic first aid procedure that describes first aid requirements for the workplace mainly on a construction project and offices. Over all project head i.e. project manager or Project director is responsible for implementation of this standard procedure in coordination with first aider and project team. First Aider and Approved Persons First aider… Read More: First Aid Procedure – Construction Project First Aid Kit Box… »

Job Safety Analysis JSA for Lifting Activity – Loading unloading using Crane and Boom Truck

Below is a precise Job Safety Analysis JSA for Lifting Activity that includes the loading and unloading of materials using Crane and Boom Truck. JOB STEPS POTENTIAL HAZARD(What can cause harm?) CONTROL MEASURE(What can be done to prevent it from going wrong?) Preparation and compliance to work permit requirements Missed information between supervisors and workers… Read More: Job Safety Analysis JSA for Lifting Activity – Loading unloading… »

Project Safety Procedure for Management and Control of Compressed Gas Cylinders

The purpose of this method statement is to provide guidance and recognition for the management, use and control of compressed gas cylinders on a construction project site. Overall project manager have responsibilities for the implementation of this standard safety procedure. Gas cylinders are hazardous because they are sealed pressure vessels in addition to the hazards… Read More: Project Safety Procedure for Management and Control of Compressed Gas… »

Flood Control Plan During Project Testing and Commissioning

This safework procedure helps to provide guidance in carrying out the necessary measures to avoid flooding during testing and commissioning activities at the construction project. Purpose of this method statement is to control the water flooding that may occur during commissioning activities. Necessary Instruments, Equipment & Tools Mechanical Plumbing Tool Kit Flexible Hose / PVC… Read More: Flood Control Plan During Project Testing and Commissioning »