Civil Method Statements

Chasing Work on Block Wall for PVC Conduits

Chasing Work Method Statement

Following tools shall be arranged before start of the Chasing Work on Block Wall for PVC Conduits. Necessary measures will be taken for the safety of the equipment and any other works affected by the works subject of this document. Mason Trowel Wheel Barrow Plumb Joint Filler Mortar mixer Mechanical Cutter …

Read More »

GRP Fins Installation Method of Statement

Below is the method for the installation of GRP Fins. Before starting the installation work for GRP fins following equipment/tools shall be arranged: Tower crane chain block spanners hammers Hilti Machine Spirit level Water level Steps for GRP Fins Installation Scaffolding should be provided in the area where fins are …

Read More »

Epoxy Paint Application Method Statement Procedure

Epoxy Paint Application

This document describes the methodology for the application of epoxy paint for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable safety and quality procedures, and project documents and specification. Necessary …

Read More »