Category Archives: Civil Method Statements

Method Statement for Curtains and Drapes Installation

1. Introduction This Method Statement for Curtains and Drapes Installation describes the procedures and quality requirements for installing curtains, drapes, roller blinds, motorized blinds, and associated window-covering systems in residential, commercial, hospitality, and other building projects. The purpose of this document is to ensure that all installation activities are carried out safely, efficiently, and in… Read More: Method Statement for Curtains and Drapes Installation »

Method Statement for Starting Wild Air Cooling of Building

What is wild air in HVAC? Wild air is the supply of air to a building which is being constructed or renovated and having central air conditioning system. In order to fulfill the temporary cooling and ventilation requirements for a building its air handling units are put in operation to feed the air which is… Read More: Method Statement for Starting Wild Air Cooling of Building »

Safework Method of Statement for Production & Erection of Concrete Precast Wall Boundary

Below is a safework method of statement that covers first the production of wall panels in a precast factory and then erection of precast concrete boundary wall for any kind of the project. In a precast factory moulds are used for casting precast units or precast wall panels as per the required sizes. Precast elements… Read More: Safework Method of Statement for Production & Erection of Concrete… »

Welding Method Statement | Fabrication Welding Weld Repair and Inspection

The purpose of this welding procedure is to describe the steel structure fabrication methods, welding techniques, quality assurance and quality inspections to be carried out about welding, weld repair and weld inspections for any kind and size of fabrication project. Material Supply The quality of materials should be according to Customer specifications and welding drawings.… Read More: Welding Method Statement | Fabrication Welding Weld Repair and Inspection »

Method Statement for Earth Work Including the Preparation of Formation Level

The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications. Method statement covers the requirements for all earth works up to and including… Read More: Method Statement for Earth Work Including the Preparation of Formation… »

Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m Depth of excavation : -2.30m (Gen) Depth of excavation : -3.30m / 5.50m… Read More: Safe Work Method Of Statement For Dewatering Work »

Safe Work Method Statement for Excavation of Trenching

Main contractors will conduct inductions for all workers (inclusive of employees and subcontractors) prior to commencing site work. A record of site inductions and toolbox meetings will be kept at the contractors office for future reference. The contractor or client will provide adequate amenities (toilets, wash rooms, dining facilities etc.) as defined for this work… Read More: Safe Work Method Statement for Excavation of Trenching »