Category: Fire Fighting Systems
-
Pipe Welding Procedure
The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in accordance with mechanical specifications for pipe sizes 65mm dia. and above. The work…
-
Installation of HVAC VCD Fire Smoke Dampers and Accessories
This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of how the ductwork will be carried out and what health and safety issues…
-
Fire Hose Reel Testing and Commissioning Method Statement
Below is a precise method statement for fire hose reel testing and commissioning part of project fire fighting system. Automatic wet system is a system that is attached to a water supply capable of supplying the system demand at all fires and that requires no action other than opening a hose valve to provide water…
-
Basement MEP Coordination Shop Drawing Preparation and Checklist
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the…
-
Pump House / Pump Room Piping & Pumps Installation Method Statement
Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.…
-
Method Statement for Fire Suppression System Installation Testing & Commissioning
Required Tools/Equipment Multimeter Detector Testing Tool Hilti Machine Drill Machine Pull string Step Ladders Mobile Scaffold Preparation Work Before Installation With the aid of computer software program design the system and prepare isometric drawing. Prepare layout drawing of piping network system and mechanical equipment of SINORIX1230 System. Prepare drawings of detection system. Obtain approval of the concerned…
-
METHOD STATEMENT FOR INSTALLATION OF SPRINKLER & FIRE FIGHTING SYSTEM PIPEWORK & ACCESSORIES
The purpose of this Method Statement is to define the procedure step by step to implement the correct practices for installation of sprinkler & fire fighting pipework & accessories through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Portable Hand tools…
-
METHOD STATEMENT FOR INSTALLATION OF FIRE HOSE CABINETS, HOSE RACK, HOSE REEL & EXTINGUISHERS
METHOD STATEMENT FOR INSTALLATION OF FIRE HOSE CABINETS, HOSE RACK, HOSE REEL & EXTINGUISHERS. Following tools shall be required for the installation of hose reel cabinets/racks and extinguishers. Portable Hand tools Portable Drill machines Portable Grinding machine Gas Cutting set Welding machine Pipe grooving machine Pipe threading machine HANDLING & STORAGE OF MATERIALS On receipt…
-
Method Statement For Installation Of Firefighting Pump Set
Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at site. On the floor, Fire Fighting pumps will be stored in a clean,…
-
VESDA System Testing and Commissioning Method Of Statement
List of tools required for VESDA system testing and commissioning which should be arranged before starting the work. Portable Hand tools Step Ladder Insulation Resistance Tester Continuity tester Precommissioning Procedure for VESDA System Check the location of installation of the panel is as per the manufacturer’s recommendation & approved shop drawings. Check the mounting height of…