Category: Technical Guides
-
Basement MEP Coordination Shop Drawing Preparation and Checklist
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the…
-
Radiation Safety Procedure for Site Gama Ray Radiography for NDT Weld Test
This method of statement describes the specific performance requirement for safe conduct of industrial gamma ray radiography at a project site. The method shall be implemented as per the local regulations concerning Radiation Protection in using sealed Radioactive isotopes in Industrial Radiography. This page gives just general information for basic understanding and should not be…
-
Safe Work Method of Statement SWMS & Risk Assessments [Download]
If you are looking for combination of safework method statement for construction works with risk assessments then you are at right place. This website provides tons of safe work method statements that are editable and reusable by the people like you who are willing to prepare technical documents and installation procedure in the safe work…
-
Block Wall Construction Control Procedure for Blockwork
This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out in accordance with the project specifications. In any circumstance where specifications are not…
-
Construction Vehicle and Plant Servicing Procedure
Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work: Ensure that all maintenance and servicing activity is done only in designated area.…
-
Project Safety Procedure for Management and Control of Compressed Gas Cylinders
The purpose of this method statement is to provide guidance and recognition for the management, use and control of compressed gas cylinders on a construction project site. Overall project manager have responsibilities for the implementation of this standard safety procedure. Gas cylinders are hazardous because they are sealed pressure vessels in addition to the hazards…
-
Construction Site Safety Committee Meeting Procedure – HSE Management
Table of Contents 1.0 Purpose 2.0 Scope 3.0 References 4.0 Definitions and Abbreviations 5.0 Responsibilities 6.0 Procedure 6.1 Notice of Meeting 6.2 Agenda and Attendance 6.3 Confirmation of Previous Minutes 6.4 Matters Arising (include Safety, Health and Environmental Audit Findings) 6.5 Safety Representative Reports 6.6 Incident – Accident Reports 6.7 Safety Topic 6.8 Environmental 6.9…
-
Method Statement for Major and Minor Concrete Repair & Filling of Pinholes and Cracks
This repairing method statement applies to all concrete repair of the following types. Major Repair: For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete repairs should be supervised by specialist personal. For all major concrete repair works…
-
Method of Statement for Construction Of Pilecap Foundations
This Method Statement outlines methodology and acceptable parameters for all activities for construction of Pile cap foundations for the project building. In addition this method covers types of plants and machinery, sequence and area of works, testing (Quality Control), health and safety. Plant and Machinery Excavator – 1 No. Crane – 1 No – wherever…
-
Safe Work Method for Working at Height Including Inside Shafts and Risers
Major hazards while working at height and inside the shafts are falling from height, falling objects and collapse of structure. Below is the precise list of control measures that are applicable for working at height inside shafts and working inside the risers. Ensure an appropriate working platform with appropriate access, egress, and guard rails etc.…