This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out
Read Full Method Statement
Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work:
Read Full Method Statement
The purpose of this method statement is to provide guidance and recognition for the management, use and control of compressed gas cylinders on a construction project site. Overall project manager have responsibilities for the implementation of this standard safety procedure. Gas cylinders
Read Full Method Statement
Table of Contents 1.0 Purpose 2.0 Scope 3.0 References 4.0 Definitions and Abbreviations 5.0 Responsibilities 6.0 Procedure 6.1 Notice of Meeting 6.2 Agenda and Attendance 6.3 Confirmation of Previous Minutes 6.4 Matters Arising (include Safety, Health and Environmental Audit Findings) 6.5 Safety
Read Full Method Statement
This repairing method statement applies to all concrete repair of the following types. Major Repair: For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete
Read Full Method Statement