Tag Archives: Upper Floor Wall Frames

SWMS for Installation of Upper Floor Sheet Flooring for Joist Spacing up to 600mm

Before implementing this or any SWMS it must be checked and adjusted to suit a person’s individual work method, as long as hazards are identified and controlled. You may need to add additional steps to suit particular work environments and circumstances. The main function of the SWMS is to identify unsafe conditions and work practices… Read More »

Safe Work Method Statement for Installation of Upper Floor Wall Frames

The sub-contractor doing the work is responsible for carrying out a particular action, as listed in this Safe Work Method Statement SWMS. The supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the extent necessary, to make sure the Safe… Read More »