Safety Requirements for Installation of Upper Floor Wall Frames
The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the extent necessary, to…
-
SWMS for Installation of Upper Floor Sheet Flooring for Joist Spacing up to 600mm
Before implementing this or any SWMS it must be checked and adjusted to suit a person’s individual work method, as long as hazards are identified and controlled. You may need to add additional steps to suit particular work environments and circumstances. The main function of the SWMS is to identify unsafe conditions and work practices…