2020
Mar
4
Safe Work Method Statement for Installation of Upper Floor Wall Frames

The sub-contractor doing the work is responsible for carrying out a particular action, as listed in this Safe Work Method Statement SWMS. The supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is