Tag: Testing & Commissioning
-
Installation Testing & Commissioning Method Statement for Earthing System
Purpose of this electrical procedure is to define the step by step method to implement the correct practices for the installation pre-commissioning & commissioning of electrical earthing system. Guidelines contained herein shall ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. The earthing system consists of…
-
Testing & Commissioning Of Water Supply Piping System Network
Precommissioning Procedure for Water supply system Ensure that the system installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Check that the Water Booster piping network is complete with proper valves, water hammer arrester drains, vents, strainers, pressure switches & instruments in place as per final approved shop drawing. Ensure…
-
Testing & Commissioning Of Water Booster Pump Set – Method Statement
The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of domestic Water Booster Pumps through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory…
-
Testing & Commissioning Of UPS System – Method Statement
The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to the loads under normal and abnormal conditions, including loss of the utility AC power.…
-
Testing & Commissioning of Sump Pump Sets
Below is a step wise method of statement for Testing & Commissioning of Sump Pump Sets. Precommissioning Procedure for Sump Pumps Ensure that the pump installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Repair all damages to the equipment paint finish. Ensure that the pumps are identified location…
-
Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s
The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. TOOLS /…
-
Staircase Pressurization System Testing & Commissioning Procedure
The purpose of this mechanical procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of staircase pressurization system through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function of HVAC ducting system…
-
Testing & Commissioning Of Split Air Conditioning AC Units
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Split AC Units through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Split A/C…
-
Method Statement For Testing & Commissioning of Smoke Extract Fans
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Smoke Extract Fans through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Smoke Extract…
-
Testing & Commissioning Of Submain Distribution Boards SMDB’s
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools for SMDB…