Welding Method Statement | Fabrication Welding Weld Repair and Inspection

The purpose of this welding procedure is to describe the steel structure fabrication methods, welding techniques, quality assurance and quality inspections to be carried out about welding, weld repair and weld inspections for any kind and size of fabrication project. Material Supply The quality of materials should be according to Customer specifications and welding drawings.… Read More: Welding Method Statement | Fabrication Welding Weld Repair and Inspection »

Welding Terms and Definitions – Define Welder

Welding Theory & Application Definitions ACETONE: A flammable, volatile liquid used in acetylene cylinders to dissolve and stabilize acetylene under high pressure. ACETYLENE: A highly combustible gas composed of carbon and hydrogen. Used as a fuel gas in the oxyacetylene welding process. ACTUAL THROAT: See THROAT OF FILLET WELD. AIR-ACETYLENE: A low temperature flare produced by burning… Read More: Welding Terms and Definitions – Define Welder »

Understanding the Welding Symbols in Engineering Drawings

Welding symbols, like sign posts are informational directors. They are placed on welding drawings by welding engineers and their purpose is to relay information to the welder. In many instances the information relayed is very simple. Welding symbols are used on blueprints and drawings to show where the weld is to be placed and may… Read More: Understanding the Welding Symbols in Engineering Drawings »

Welding Joint Design Important Considerations

Before understanding the important factors related to welding joint design, please note that apart from resistance spot welding (RSW), three processes are most commonly used for welding metal stampings and fabrications: gas metal arc welding (GMAW) or MIG; gas tungsten arc welding (GTAW) or TIG; and gas welding. Although a high initial investment is necessary,… Read More: Welding Joint Design Important Considerations »

Pipe Welding Procedure

The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in accordance with mechanical specifications for pipe sizes 65mm dia. and above. The work… Read More: Pipe Welding Procedure »

Safe Work Method Statement For Welding Of Pipes Including WPS & PQR

1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for welding at project site. 2. SCOPE : This Method Statement refers to various work procedures contained within project control documents, which explains and covers the welder qualification procedure. 3. DEFINATION WPS – Welding Procedure Specification… Read More: Safe Work Method Statement For Welding Of Pipes Including WPS… »

General Guide for Metallic Pipe Stainless Steel Fabrication Assembly and Erection

If you want to learn high quality metallic pipe fabrication procedure then this page is best place to understand some mandatory requirements. This page contains information from different standards and may not be used as reference or basis for the welding or fabrication work at a project or at workshop etc. Information is shared for… Read More: General Guide for Metallic Pipe Stainless Steel Fabrication Assembly and… »