Category Archives: HVAC Method Statements

Understanding the Welding Symbols in Engineering Drawings

Welding symbols, like sign posts are informational directors. They are placed on welding drawings by welding engineers and their purpose is to relay information to the welder. In many instances the information relayed is very simple. Welding symbols are used on blueprints and drawings to show where the weld is to be placed and may… Read More »

Method Statement for External Protective Coating of Steel Pipes and Fitting Joints

This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe fittings and joints. Inspections should be performed by QC inspectors who are certified… Read More »

Close Control Unit CCU Installation Method Statement

Unless otherwise specified, all close control unit installation shall be in accordance to approved shop drawings and contract specifications, drawing plans, schematics, and diagrams indicate general location and arrangement of closed control unit. The Project Manager is the overall responsible person for the process implementation of the ccu installation works. The Construction Manager/Site Mechanical Engineer… Read More »

Procedure for the Installation of Ventilation Fans

Requirement of Tools for Installation of Ventilation Fans Following tools and equipment shall be arranged before starting the work of Installation of Ventilation Fans. Fork Lift or Crane with capacity & arrangement in line with the Manufacturer’s recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools Portable Drilling Machine/ Grinding Machine… Read More »

Procedure for Installation of Chilled Water Pumps

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices of Installation of Chilled Water Pumps through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and… Read More »

Installation of Pressurisation Units & Chemical Dosing System

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Pressurisation Units & Chemical Dosing System through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level.… Read More »

Method Statement for Installation of Grills, Diffusers, Registers & Louvers

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Grills, Diffusers, Registers & Louvers through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and materials… Read More »