Category Archives: Electrical Method Statements

GI Conduit Installation Method Statement for Electrical Works

The purpose of this electrical works method statement is to establish a systematic and controlled procedure for the installation of Galvanized Iron (GI) conduit systems used for electrical containment works within the project. By following this method statement contractor shall ensure that GI conduit installation activities are carried out safely, efficiently, and in compliance with… Read More: GI Conduit Installation Method Statement for Electrical Works »

HV Switchgear 11 KV Panels Installation Method Statement

Below is a precise electrical method statement that covers high voltage switchgear 11 KV Panels installation and inspections. HV Switchgear and accessories shall be in line with the approved material submittals, approved drawings by authorities, local and international rules/regulations/standards. Required Tools: Following tools shall be used for the installation of HV switchgear panels: Fork Lift… Read More: HV Switchgear 11 KV Panels Installation Method Statement »

Cable Tray Trunking & Ladder Installation Method Statement

Below is a complete method statement for installation of cable tray, cable trunking and cable ladders in compliance with project specifications and approved material submittals. Tool Required: Portable hand tools Portable Drilling Machine/ Grinding Machine Jigsaw Machine Spirit Level Level Threads Material Handling & Storage On receipt of the cable tray, trunking, cable ladder and… Read More: Cable Tray Trunking & Ladder Installation Method Statement »

Central Battery System Installation Method Statement

Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material  On receipt of the Central Battery System and accessories at site, necessary precautions shall be taken for… Read More: Central Battery System Installation Method Statement »

Method Statement for Fluke Testing & Commissioning of Telephone Data System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System. By implementing the guidelines contained herein installation team shall ensure that the electrical job execution complies with the project requirements and serves the intended function to… Read More: Method Statement for Fluke Testing & Commissioning of Telephone Data… »

UPS System Testing & Commissioning – Method Statement

The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. UPS system provides continuous, regulated AC power to the loads under normal and abnormal conditions, including loss of the utility AC… Read More: UPS System Testing & Commissioning – Method Statement »

Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s

The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to… Read More: Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s »