Below is complete safe method of statement which is covering all civil works related to the swimming pool construction/installation. Obtain necessary clearances and approvals from consulting engineers including MEP clearance for existing underground utilities. Selected working area should be barricaded to avoid
Read Full Method Statement
Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept
Read Full Method Statement
This civil work method statement is to describe the materials and procedures for the installation of tile installation works including the technical method of application and the sequence of works to be carried out for the project. Necessary Plant & Equipment Typical
Read Full Method Statement
Below is a safework method of statement that covers first the production of wall panels in a precast factory and then erection of precast concrete boundary wall for any kind of the project. In a precast factory moulds are used for casting
Read Full Method Statement
Below is given the method statement or procedure for the safe work of block works. Ensure all Clearances and approval from the concerned are obtained. Selected working area should be barricaded to avoid accidents & damages. Verify all requirements as per required in
Read Full Method Statement