Category Archives: Civil Method Statements

Sheet Pile Installation Method Statement

The installation of sheet piles are the famous type of temporary works for the construction of building or bridge during foundation works such as pilecap structural. Steel sheet piles are long structural sections with a vertical interlocking system that creates a continuous wall. The walls are most often used to retain either soil or water.… Read More: Sheet Pile Installation Method Statement »

Method Statement for Road Markings using Water Based Clear Epoxy EpoCrete 100W

Description of the material EpoCrete 100W is a two-component, water dispersible, non-toxic, clear, epoxy coating with excellent resistance to abrasion and moisture. EpoCrete 100W does not contain any volatile organic compounds and is a safer and more environmentally friendly alternative to conventional coatings such as solvent based epoxies, polyesters, and acrylics. EpoCrete 100W is highly… Read More: Method Statement for Road Markings using Water Based Clear Epoxy… »

Tile Installation Method Statement for Ceramic Floor Tiles

Below tile installation method details construction procedure or Method Statement for floor tiles installation which can be used for any kind of ceramic tiling works. Selected working area should be barricaded to avoid accidents & damages. Obtain necessary clearances and approvals from consultant including MEP clearance. Ensure that the surface receiving the floor tiles is… Read More: Tile Installation Method Statement for Ceramic Floor Tiles »

GRP Lining Installation Method Statement

GRP Lining Meaning: Glass reinforced plastic GRP is molded plastic reinforced with lengths of glass fiber. Injected molded GRP has very short fiber length up to 3 mm whereas composite laminating and DMC and SMC molding have long or continuous lengths of glass fiber reinforcement. You can follow below steps to prepare a method statement… Read More: GRP Lining Installation Method Statement »

Method Statement for Civil Works for Swimming Pool Installation

Below is complete safe method of statement which is covering all civil works related to the swimming pool construction/installation. Obtain necessary clearances and approvals from consulting engineers including MEP clearance for existing underground utilities. Selected working area should be barricaded to avoid accidents & damages. Surface Preparation All concrete surfaces will be cleaned from any… Read More: Method Statement for Civil Works for Swimming Pool Installation »

Safe Work Method Of Statement for Ceramic Wall & Floor Tiles Installation

This civil work method statement is to describe the materials and procedures for the installation of tile installation works including the technical method of application and the sequence of works to be carried out for the project. Necessary Plant & Equipment Typical plant equipment to be used shall consist of: ~ Grease ~ Duct Tape… Read More: Safe Work Method Of Statement for Ceramic Wall & Floor… »

Safe Work Method Statement for Block Works

Below is given the method statement or procedure for the safe work of block works. Ensure all Clearances and approval from the concerned are obtained. Selected working area should be barricaded to avoid accidents & damages. Verify all requirements as per required in the specifications ( water proofing ,dowels ,etc.) especially rough ins of all required… Read More: Safe Work Method Statement for Block Works »