Category Archives: Civil Method Statements

Gypsum Board Ceiling Installation Method of Statement

Below is a brief method of statement for the installation of gypsum ceiling work in simple steps which can be followed for easy understanding and sequencing the works. Before starting the false ceiling installation works obtain necessary clearances and approvals from all disciplines including MEP clearance. Arrange proper and secure scaffolding for ceiling installation work.… Read More: Gypsum Board Ceiling Installation Method of Statement »

Method Statement for Protection of Trees

We have given below a method statement for the protection of the existing trees on the project site. This is in many cases required to protect the trees and any other natural object that would be required permanently during and after the project is completed. Requirement also comes when people are working inside the densely populated… Read More: Method Statement for Protection of Trees »

Safe Work Method Statement for Concreting for Tower Crane Foundation

Below is the safe work method statement for the installation of tower crane foundation or tower crane base. The installation will be as per the approved tower crane foundation drawings and details which is mostly different for different types of tower cranes, but procedural steps can be same as below for general understanding of the… Read More: Safe Work Method Statement for Concreting for Tower Crane Foundation »

Safety Requirements for Installation of Upper Floor Wall Frames

The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the extent necessary, to… Read More: Safety Requirements for Installation of Upper Floor Wall Frames »

Concrete Pavement Method Statement

This page covers the method statement for the construction of plain cement concrete pavement in accordance with the drawings & specifications and in conformity with lines, grades and cross sections shown on the drawings. All the joint details shall be as per the approved working drawing. Concrete pavement installations shall be done in compliance with… Read More: Concrete Pavement Method Statement »

Safe work method statement for the installation of foundation waterproofing

Below is given a Safe work method statement for the installation of foundation waterproofing that can be applicable for safe working for any building or project construction. Ensure Material for water proofing material is  approved prior to application. Ensure  surface preparation is approved  prior to start procedure for waterproofing application. Ensure that chamfer at foundations… Read More: Safe work method statement for the installation of foundation waterproofing »

Method Statement for Demolition Work of Existing Boundary Wall

Below is a simple to understand safe work method statement for the Demolition of Existing Boundary Wall before starting a new project or renovation works. No. Description of Activity Responsibility 1.0 Ensure all clearances from the concerned Government Department obtain PE/SE 2.0 Selected working area should be barricaded to avoid accidents & damages PE/Safety Officer… Read More: Method Statement for Demolition Work of Existing Boundary Wall »