Procedure for the Installation of Ventilation Fans

Requirement of Tools for Installation of Fans Following tools and equipment shall be arranged before starting the work of Installation of Ventilation Fans. Fork Lift or Crane with capacity & arrangement in line with the Manufacturer’s , recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools. Portable Drilling Machine/ Grinding Machine…

Read More

Procedure for Installation of Chilled Water Pumps

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices of Installation of Chilled Water Pumps through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and…

Read More

Installation of Pressurisation Units & Chemical Dosing System

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Pressurisation Units & Chemical Dosing System through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level….

Read More

Method Statement for Installation of Grills, Diffusers, Registers & Louvers

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Grills, Diffusers, Registers & Louvers through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and materials…

Read More