Necessary equipment & tools: Following tools shall be arranged before installation works: Squeegee Roller Brush Level Machine Sanding machine Hammer Drill machine Screw Drivers Method Statement for Wooden Flooring Installation Obtain necessary clearances and approvals from Engineers including MEP clearance. Inspection request should
Read Full Method Statement
Following tools shall be arranged before start of the work. Spirit Level Alignment line Drill machine Chalk line Hammer Set of screw drivers Below is Method Statement for Cubicles & Lockers Installations Obtain necessary clearances and approvals from Engineers including MEP clearance. Ensure the
Read Full Method Statement
Below is the list of tools and other equipment required for ceiling tiles installation. Drill machine Set of screw drivers Level Hammer Shooting Gun machine Jack Saw Method Statement for Aluminium Ceiling Tiles Installation Obtain necessary clearances and approvals from Engineers including
Read Full Method Statement
Method Statement for Curtains and Drapes Installation Obtain necessary clearances and approvals from Engineers including MEP clearance from MEP contractor. Proper Scaffolding (mobile) should be provided for blinds installation. It should be inspected and approved by safety officer. IR should be submitted
Read Full Method Statement
Below is the step wise method statement for Acrylic Flooring Installation. Obtain necessary clearances and approvals from Engineers including MEP clearance. Selected working area should be barricaded to avoid accidents & damages. Ensure the surface to receive the Acrylic surface will be
Read Full Method Statement