The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications.
Read Full Method Statement
This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data: Water Table level : m
Read Full Method Statement
Main contractors will conduct inductions for all workers (inclusive of employees and subcontractors) prior to commencing site work. A record of site inductions and toolbox meetings will be kept at the contractors office for future reference. The contractor or client will provide
Read Full Method Statement
Below is a detailed procedure for the installation of Premix Plaster, which is good to understand the way of work. Description of Activity: Surface Preparation The fair faced concrete background should be thoroughly cleaned devoid of dust, loose particles, wood pieces, mould oil
Read Full Method Statement
Procedure and safe work method statement for installation of Wall padding panels. Below is only step wise procedure and complete method statement will have all sections like scope, references, responsibilities, ITP, Checklists and risk assessments. Description of Activity Preparation of the Sub