2025
Jul
24

Safework Method of Statement for Production & Erection of Concrete Precast Wall Boundary

Safework Method of Statement for Production & Erection of Precast Concrete Boundary Wall Panel

Below is a safework method of statement that covers first the production of wall panels in a precast factory and then erection of precast concrete boundary wall for any kind of the project. In a precast factory moulds are used for casting

2025
Jul
19

Welding Method Statement | Fabrication Welding Weld Repair and Inspection

The purpose of this welding procedure is to describe the steel structure fabrication methods, welding techniques, quality assurance and quality inspections to be carried out about welding, weld repair and weld inspections for any kind and size of fabrication project. Material Supply

2025
May
30

Method Statement for Earth Work Including the Preparation of Formation Level

Method Statement for Earth Work Including the Preparation of Formation Level

The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications.

2025
May
25

Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m

2025
May
17

Safe Work Method Statement for Excavation of Trenching

Excavation or Trenching Safe Work Method Statement

Main contractors will conduct inductions for all workers (inclusive of employees and subcontractors) prior to commencing site work. A record of site inductions and toolbox meetings will be kept at the contractors office for future reference. The contractor or client will provide