Table of Content General Construction Sequence List of Equipment List of Manpower Construction Method HSE Control Quality Assurance GENERAL Site preparation is one of the preliminary works to be done for starting construction works. The selected construction site preparation need to be
Read Full Method Statement
Description of the material EpoCrete 100W is a two-component, water dispersible, non-toxic, clear, epoxy coating with excellent resistance to abrasion and moisture. EpoCrete 100W does not contain any volatile organic compounds and is a safer and more environmentally friendly alternative to conventional
Read Full Method Statement
You can perform the work for the installation of Aluminum Glazing Cladding Works & Accessories as per the simple steps given below. Ensure works areas, all floor slabs, parapets if any, shall be complete, clean and kept clear from all trades prior to
Read Full Method Statement
TABLE OF CONTENTS 1. SCOPE OF WORK 2. PROGRAMME 3. MATERIALS 3.1 MATERIAL SUPPLY 3.2 MATERIAL IDENTIFICATION AND TRACEABILITY 3.3 RAW MATERIAL TESTING 4. METHOD & SEQUENCE OF THE WORK 4.1 FABRICATION 4.2 FABRICATION PROCESS 4.2.1 CUTTING PLANS 4.2.2 MARKING 4.2.3 CUTTING
Read Full Method Statement
Below tile installation method details construction procedure or Method Statement for floor tiles installation which can be used for any kind of ceramic tiling works. Selected working area should be barricaded to avoid accidents & damages. Obtain necessary clearances and approvals from
Read Full Method Statement