Indoor Air Quality Environmental & Comfort Level Testing For HVAC System

The purpose of this procedure is to define the step by step method to implement the correct practices for the “Environmental Test including temperature and humidity levels” through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory comfort level in the areas. TOOLS… Read More »

METHOD STATEMENT FOR PRECOMMISSIONING & COMMISSIONING OF EXTRACT FANS

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Extract Fans through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Pre-commissioning Procedure for Extract Fans: Ensure… Read More »

Method Statement For Installation of Glazing Panel to GRP Fins

Programs of work for the Installation of Glazing Panels to GRP Fin shall follow the Planning and Programming of the Main Contractor. In event of any major changes in execution or shift in milestones of work schedule could occur, revised method statement and work program shall be submitted for approval. Materials Submittal: Materials Submittal usually contains… Read More »

Testing & Commissioning Of Fan Coil Units FCU’s

This method of statement is prepared in order to define the step by step method to implement the correct practices for the pre commissioning & commissioning of FCU’s Fan Coil Units through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. REQUIRED… Read More »

Method Statement for Sign Board Excavation & Installation

Below is the safe work method of statement for installation of Sign Boards that includes excavation as well.. Ensure all clearances from the concerned Government Department is obtained. Mark required area to be  excavated as per approved sign board locations. Selected working area should be barricaded to avoid accidents & damages. Mark required area for excavation… Read More »