METHOD STATEMENT FOR INSTALLATION OF WATER SUPPLY PUMP (HOT & COLD)

METHOD STATEMENT FOR INSTALLATION OF WATER SUPPLY PUMP (HOT & COLD) Ensured that the proper clearance is available from civil side before commencement of works. Ensured that the work area is clean and safe for carrying out the activities. Prior to start of works, it shall be ensured that the relevant shop drawings and coordination drawings […]

INSTALLATION OF DRAINAGE,RAIN WATER & CONDENSATE DRAIN PIPE WORK

INSTALLATIONOF DRAINAGE,RAIN WATER & CONDENSATE DRAIN PIPE WORK On receipt of Drainage & rain water pipes & fittings , the materials shall be handled & stored in line with the following procedure: Pipes will be stacked on a flat surface free from sharp projections, stones or other objects likely to cause point loading or pipe deformation. The storage […]

METHOD STATEMENT FOR INSTALLATION OF SUMP PUMPS

Below is procedure for the installation of sump pump. Prior to start of installation it shall be ensured that the shop drawings including coordination drawings of the respective area are approved. It shall be ensured that the area is released by civil contractor to proceed with MEP installations. It shall be ensured that the Sump Pumps are […]

METHOD STATEMENT FOR INSTALLATION OF SPRINKLER & FIRE FIGHTING SYSTEM PIPEWORK &  ACCESSORIES

The purpose of this Method Statement is to define the procedure step by step to implement the correct practices for Installation of sprinkler & fire fighting pipework & accessories through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Portable Hand tools Portable […]

Method Statement for Roof Water Proofing in Steps with Responsibility Matrix

Below equipment’s & tools shall be arranged before starting the process of roof waterproofing works. Measuring tape Cylinder fed propane torch Heavy duty press rollers Cotton waste  Paint roller and paint brush  Paint roller and paint brush Heavy duty scissors Thinner or solvent cleaner Broom brush Hand gloves Method Statement for Roof Water Proofing in […]

Method Statement for Carpeting Works

Required tools & equipment: Following tools or equipment’s shall be arranged: Seam sealer & Edge sealer Cushion back cutter or top cutter Notched trowel 50-75 lb. roller Mini or crab stretcher and power stretcher Knee kicker Straight edges Razor knives Hammer Stay nails, dry line Chalk line and tape measure Procedure for the installation works: Preparation […]