2024
Feb
5

Light Fixture / Light Fittings Installation Method Statement

Light Fixture Light Fittings Installation Method Statement

This method statement covers the Installation of Lighting Fixtures for any kind of building project including the external and internal lighting installation. Before start of light fittings installation electrical engineer will ensure that all wiring is complete, tested and approved from the

2024
Feb
4

Confined Space Working Method Statement – Occupational health and safety Procedure

Confined Space Working Method Statement - Occupational health and safety Procedure

This method statement covers working inside confined space for MEP and civil works for any kind of project. Project health and safety team is responsible for implementation of below method in order to ensure that all workers are safe while working inside

2024
Feb
1

Safety Requirements for Installation of Upper Floor Wall Frames

Safe Work Method Statement for Installation of Upper Floor Wall Frames

The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures