Method Statement for Acrylic Flooring Installation

Below is the step wise method statement for Acrylic Flooring Installation. Obtain necessary clearances and approvals from Engineers including MEP clearance. Selected working area should be barricaded to avoid accidents & damages. Ensure the surface to receive the Acrylic surface will be thoroughly cleaned and it will be made free from any dust and loose… Read More »

Safe Work Method Statement for Installation of Rubber Flooring

Below is given the method statement for installation of rubber flooring related to any type of project. Arrange the following instrument’s or equipment. Cutting knife Wood saw Vertical cutting saw with mixed cutting blades Carpenter’s line Notched spatula 900  angle Measuring tape 2 m screed bar 1 m long angle for cutting using the Knife… Read More »

Safe Work Method Statement for Civil Works for Swimming Pool

Below is the list of required tools which shall be arranged before start of civil works for swimming pool works. Plaster spray machine Aluminium rod for leveling, water level, split level Trowel Scrapper Roller Drill for mixing Rubber hammer Tile spacer Air blower Sponge bucket Asphalt burner for torching the membrane Method Statement for Civil… Read More »

Safe Work Method Of Statement for Acoustic Fabric Panels Installation

1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance prior to start work. 2.0 Proper Scaffolding should be provided for tall walls. It should be inspected and approved by safety officer. 3.0 RFIA should be submitted and ensure its approval prior to start work. 4.0 Before Installation ensure wall is free from any… Read More »

Safe Work Method Statement for Vinyl Flooring

Below is given the safe Method Statement for performing the installation of vinyl Flooring in simple steps. Selected working area should be barricaded to avoid accidents & damages and obtain necessary clearances  and approvals from Engineers including MEP clearance. Inspection request to be raised and ensure its approval prior to start vinyl flooring. Ensure the… Read More »