1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Fire Alarm FA System through the guide line contained herein so as to ensure that the job execution
Read Full Method Statement
1.0 PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Earthing, bonding & Lightning protection system through the guidelines contained herein so as to ensure that the job execution complies
Read Full Method Statement
The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Diesel Generator Set through the guide line contained herein so as to ensure that the job execution complies with the requirements
Read Full Method Statement
Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading,
Read Full Method Statement
Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved material submittal and approved drawings by authorities and as per rules and standards. Required Tools: Fork Lift or Hydraulic Crane,