DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when
Read Full Method Statement
The purpose of this procedure is to define step by step the method for the precommissioning & commissioning of argonite fire suppression system. Testing and commissioning parameters shall be as per the specific project requirements, specifications and applicable local and international standards.
Read Full Method Statement
1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for welding at project site. 2. SCOPE : This Method Statement refers to various work procedures contained within project control documents, which explains
Read Full Method Statement
The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in
Read Full Method Statement
This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of
Read Full Method Statement