Category Archives: Fire Fighting Systems

Fire Alarm Method Statement for Testing & Commissioning

Purpose of below fire alarm method statement is to explain the steps for the testing & commissioning of fire alarm system. This procedure defines the step by step method to implement the correct practices for the pre commissioning & commissioning of fire alarm system through the guidelines contained herein so as to ensure that the… Read More »

Pipe Welding Procedure

The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in accordance with mechanical specifications for pipe sizes 65mm dia. and above. The work… Read More »

Safe Work Method Statement For Welding Of Pipes Including WPS & PQR

1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for welding at project site. 2. SCOPE : This Method Statement refers to various work procedures contained within project control documents, which explains and covers the welder qualification procedure. 3. DEFINATION WPS – Welding Procedure Specification… Read More »

Testing & Commissioning Method Statement For Fire Fighting Pumps

Below is a complete step wise Testing & Commissioning Method Statement For Fire Fighting Pumps. The purpose of this procedure is to define the step by step method to implement the correct practices for the testing, precommissioning & commissioning of “Fire Fighting Pumps” through the guidelines contained herein so as to ensure that the job execution complies… Read More »

Method Statement For Handling, Storage, Installation, Testing and Commissioning for Clean Agent System

1.0 PURPOSE The purpose of this method statement is to outline the method for handling, storage, installation, testing and commissioning for the Clean Agent System in accordance with the requirements specified in the relevant NFPA Codes, Standards and Project specifications in all applicable areas for the project. 2.0 SCOPE The procedure applies for the installation,… Read More »