The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for
Read Full Method Statement
This Method Statement describes the specific safe working methods which will be used to carry out the construction of new storage tank and related facilities. Document covers the scope of work required for the execution of the tank construction works. Below is
Read Full Method Statement
This method of statement describes the specific performance requirement for safe conduct of industrial gamma ray radiography at a project site. The method shall be implemented as per the local regulations concerning Radiation Protection in using sealed Radioactive isotopes in Industrial Radiography.
Read Full Method Statement
Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor.
Read Full Method Statement
The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve
Read Full Method Statement