Tag Archives: piling method statement

Method Statement for Piling Work using the Diesel Hammer

Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor. The surveyor will also be responsible for accurate survey location during erection and… Read More: Method Statement for Piling Work using the Diesel Hammer »