Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m

2022
Jun
21

Risk Assessment for Drainage Pipes Installation

risk assessment matrix for evaluating the risk

Construction and HSE team must ensure that hazard identification is complete before start of the drainage piping work. The construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal

2022
May
18

Stainless Steel Piping Fabrication SS Piping Method Statement

Touchup Paint Method for Protective Painting and Coating of Piping and Supports

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve

2022
Apr
4

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for

2021
Nov
21

Drainage Piping Above Ground Installation Plumbing Work Method of Statement

Installation and Testing of Above Ground Drainage Piping

This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the