Category Archives: Plumbing Method Statements

Excavation Method Statement

Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept in the view. This method statement covers general excavation works for foundations and… Read More: Excavation Method Statement »

Method of Statement For Installation & Laying of Hot & Cold Domestic Water Supply Pipe System

The purpose of generating this plumbing method statement is to define the procedure step by step to implement the correct practices for domestic water supply pipe laying (Hot & Cold) through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory… Read More: Method of Statement For Installation & Laying of Hot &… »

Water Booster Pump Installation Specification & Requirements

The purpose of this plumbing method statement is to describe the methodology for installation of booster pumps for cold water and to detail the steps to be taken to meet the HSE requirements specified for the execution of the project activities. HSE Requirements All personnel working at site shall attend HSE induction / awareness training… Read More: Water Booster Pump Installation Specification & Requirements »

High Density Polyethylene Pipe HDPE Piping Installation Method of Statement

The purpose of this plumbing method statement is to identify the requirements/methodology for installation of High Density Polyethylene Pipe / HDPE Pipe and fittings in as per the project specifications, drawings and the local regulations as applicable. Over all it is the responsibility of site plumbing engineer and foreman to ensure that the HDPE pipe… Read More: High Density Polyethylene Pipe HDPE Piping Installation Method of Statement »

Fire Hose Reel Testing and Commissioning Method Statement

Below is a precise method statement for fire hose reel testing and commissioning part of project fire fighting system. Automatic wet system is a system that is attached to a water supply capable of supplying the system demand at all fires and that requires no action other than opening a hose valve to provide water… Read More: Fire Hose Reel Testing and Commissioning Method Statement »

Basement MEP Coordination Shop Drawing Preparation and Checklist

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the… Read More: Basement MEP Coordination Shop Drawing Preparation and Checklist »

Risk Assessment for Drainage Pipes Installation

Construction and HSE team must ensure that hazard identification is complete before start of the drainage piping work. The construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal requirements, potentially high risks). Construction and HSE team to prepare the risk assessment… Read More: Risk Assessment for Drainage Pipes Installation »