Category Archives: Plumbing Method Statements

Stainless Steel Piping Fabrication SS Piping Method Statement

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve the highest quality of workmanship and the safe execution of the ss piping… Read More: Stainless Steel Piping Fabrication SS Piping Method Statement »

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.… Read More: Pump House / Pump Room Piping & Pumps Installation Method… »

Drainage Piping Above Ground Installation Plumbing Work Method of Statement

This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the process implementation of the works. The Construction Manager/Site Engineer will be responsible for… Read More: Drainage Piping Above Ground Installation Plumbing Work Method of Statement »

Touchup Paint Method for Protective Painting and Coating of Piping and Supports

This piping repair method statement defines and guides to painting and coating works for any kind of project or structure. This method statement is applicable to the protective painting and coating for piping and supports at any construction project site. The latest revision of the project specifications and following international standards shall be used as… Read More: Touchup Paint Method for Protective Painting and Coating of Piping… »

Sump Pump Installation Method of Statement

This plumbing method statement describes the procedure for the sump pump installation. The purpose of the method statement is to ensure that work is undertaken safely, in compliance with the contract requirements and to the specified project quality requirements. Project plumbing engineer is overall responsible for the implementation of this safe work method of statement.… Read More: Sump Pump Installation Method of Statement »

Flood Control Plan During Project Testing and Commissioning

This safework procedure helps to provide guidance in carrying out the necessary measures to avoid flooding during testing and commissioning activities at the construction project. Purpose of this method statement is to control the water flooding that may occur during commissioning activities. Necessary Instruments, Equipment & Tools Mechanical Plumbing Tool Kit Flexible Hose / PVC… Read More: Flood Control Plan During Project Testing and Commissioning »

Supply and Installation of Water Reticulation System

The purpose of this safework method statement is to establish the work method for supply and installation of mild steel pipes, fittings and pipe works under the water reticulation work for project buildings, landscape, infrastructure and associated works. Upon delivery at site, pipes and accessories shall be carefully unloaded and stored in a designated area… Read More: Supply and Installation of Water Reticulation System »