Category Archives: Plumbing Method Statements

Method Statement for External Protective Coating of Steel Pipes and Fitting Joints

This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe fittings and joints. Inspections should be performed by QC inspectors who are certified… Read More: Method Statement for External Protective Coating of Steel Pipes and… »

Sanitary Wares Installation & Inspection Method of Statement

This document defines the methods to use to ensure that the works at construction site are in compliance with the approved designs and approved materials. This method statement describes the procedure for installation of sanitary wares. Scope of Document This document applies to the inward site inspection, installation and inspection methods to be adopted for… Read More: Sanitary Wares Installation & Inspection Method of Statement »

Method Statement for Installation & Leak Test of Underground Drainage Piping System

This document applies to the inward site inspection, installation and inspection methods to be adopted for the underground drainage piping system. The work methods are summarized as follows: Mandatory Equipment Required Measuring tape and setting out markers Electric drill hammer Hack saw cutter Pipe Fitters tool box Certified mobile scaffolds/step ladder uPVC pipes, fittings &… Read More: Method Statement for Installation & Leak Test of Underground Drainage… »

Irrigation Pump Installation Method Statement

This document describes the methodology for the Installation of Irrigation pump for the project building to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. This method statement is intended to… Read More: Irrigation Pump Installation Method Statement »

Synthetic Natural Gas SNG System Testing and Commissioning Method Statement

Prior to acceptance and initial operation, all piping installations shall be inspected and pressure tested to determine that the materials, design, fabrication, and installation practices comply with the requirements of this code. Inspection shall consist of visual examination, during or after manufacture, fabrication, assembly, or pressure tests as appropriate. Supplementary types of nondestructive inspection techniques,… Read More: Synthetic Natural Gas SNG System Testing and Commissioning Method Statement »

Synthetic Natural Gas SNG System Installation Method Statement

Below is the list of tools and equipment that shall be required for installation of Synthetic Natural Gas SNG System. Pipes and Tubes Cutter Arc Welding Machine Oxygen and Acetylene set Calibrated Pressure Gauges Standard Tool Kit for Welder Standard Tool Kit for Welding and Brazing Hand Tools (Wrenches) Pressure Testing Pump Pre Requirements Check… Read More: Synthetic Natural Gas SNG System Installation Method Statement »

Method Statement for Testing & Commissioning of Calorifiers

The purpose of this method statement is to define the procedure for the on site commissioning of the Calorifiers. This method statement should be read in conjunction with the relevant method statement for installation outlining the responsibility and quality verification to be performed by various parties. Method Statement for Commissioning of Calorifiers The manufacturer’s commissioning Engineer… Read More: Method Statement for Testing & Commissioning of Calorifiers »