Category Archives: Plumbing Method Statements

Method Statement for Fire Suppression System Installation Testing & Commissioning

Required Tools/Equipment Multimeter Detector Testing Tool Hilti Machine Drill Machine Pull string Step Ladders Mobile Scaffold Preparation Work Before Installation With the aid of computer software program design the system and prepare isometric drawing. Prepare layout drawing of piping network system and mechanical equipment of SINORIX1230 System. Prepare drawings of detection system. Obtain approval of the concerned… Read More: Method Statement for Fire Suppression System Installation Testing & Commissioning »

INSTALLATION OF DRAINAGE, RAIN WATER & CONDENSATE DRAIN PIPE WORK

INSTALLATION OF DRAINAGE,RAIN WATER & CONDENSATE DRAIN PIPE WORK On receipt of Drainage & rain water pipes & fittings , the materials shall be handled & stored in line with the following procedure: Pipes will be stacked on a flat surface free from sharp projections, stones or other objects likely to cause point loading or pipe deformation. The… Read More: INSTALLATION OF DRAINAGE, RAIN WATER & CONDENSATE DRAIN PIPE WORK »

METHOD STATEMENT FOR INSTALLATION OF SPRINKLER & FIRE FIGHTING SYSTEM PIPEWORK &  ACCESSORIES

The purpose of this Method Statement is to define the procedure step by step to implement the correct practices for installation of sprinkler & fire fighting pipework & accessories through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Portable Hand tools… Read More: METHOD STATEMENT FOR INSTALLATION OF SPRINKLER & FIRE FIGHTING SYSTEM PIPEWORK &… »