If you are looking for combination of safework method statement for construction works with risk assessments then you are at right place. This website provides tons of safe work method statements that are editable and reusable by the people like you who are willing to prepare technical documents and installation procedure in the safe work… Read More »

Installation Testing & Commissioning Method Statement for Earthing System

Purpose of this electrical procedure is to define the step by step method to implement the correct practices for the installation pre-commissioning & commissioning of electrical earthing system. Guidelines contained herein shall ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. The earthing system consists of… Read More »

Electrical Busbar Assemblies Installation Method Statement

This electrical method statement covers the installation of bus bar electrical assemblies. Following this procedure shall ensure that the installation has been carried out as per contract requirements and best practices. Method gives details of how the work will be carried out and how related health and safety issues and controls shall be implemented. A… Read More »

ACS Access Control Electronic Security System Installation & Testing Method Statement

This procedure covers installation & testing of access control system including readers, reader interfaces and accessories, to ensure the required quality control activities are done as per project specifications and client requirements. Method statement details the activities, procedure to follow, specialized tooling and safety requirements, applicable to the execution of the construction/installation work in a… Read More »

Method Statement for Piling Work using the Diesel Hammer

Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor. The surveyor will also be responsible for accurate survey location during erection and… Read More »